Mechnotech Trading and Contracting W.L.L: KAHRAMAA / VOLTAGE Project Experience(Ongoing)
HVAC Infrastructure & Specialized Installation
We are managing the ongoing installation of heavy-duty HVAC systems designed for continuous, 24/7 operation.
- Precision Mounting: Ongoing installation of Air Handling Units (AHUs) and specialized cooling units tailored to maintain strict temperature and humidity ranges for sensitive electrical control rooms.
- Vibration & Noise Control: Implementing advanced mounting solutions to ensure that mechanical vibrations do not interfere with high-voltage electrical equipment.
KAHRAMAA-Compliant Ducting & Air Distribution
We are managing the ongoing installation of heavy-duty HVAC systems designed for continuous, 24/7 operation.
- Ductwork & Vapor Barriers: Fabrication of internal ductwork featuring high-performance thermal insulation and heavy-duty vapor barriers. This is essential to prevent condensation in environments where moisture could lead to catastrophic electrical faults.
- Sand Trap Louvers: Integration of specialized external louvers designed to filter the harsh desert air, ensuring sand and debris are kept out of the mechanical systems.
Project information
- Category CO2 Water Alternating Gas(WAG)
- Client Qatar Energy
- Project date Ongoing